Standard requirements for installation of salt spray test chamber

Apr 25, 2021 Leave a message

A. Installation of water replenishment system for salt spray test chamber

1. Water quality requirements: install filters for industrial water or tap water (the pH of the filtered water is between 6.5 and 7.2) or purified water (mineral water contains minerals and cannot be used)

2. Pressure requirement: The water pressure is 1~3 kg to ensure the normal replenishment.

3. Interface requirements: The water supply port of the equipment should be connected with a hose and fixed with a sealing ring to prevent leakage.


B. Requirements for the power supply system of the salt spray test chamber

1. Power requirements: single-phase AC 220V 50Hz

2. Current requirement: Max 15 A

3. Protection requirements: an independent leakage protection switch needs to be installed


C. Installation of the intake system of the salt spray test chamber

1. Pressure requirements: air compressor or air supply pipe pressure ≥ 3 kg, dry and clean

2. Interface requirements: the equipment uses quick connectors to facilitate disassembly and maintenance

3. Time requirements: The air supply must be supplied for a long time without interruption during normal operation of the equipment


D. The requirements of the exhaust system of the salt spray test chamber

1. Material requirements: PVC polyethylene material (corrosion resistant) must be used

2. Interface requirements: The exhaust port of the equipment must be connected with a hard pipe and sealed with sealant to prevent air leakage.

3. Drilling requirements: The equipment is naturally exhausted, and the height of the wall opening must be slightly higher than the exhaust hole to ensure that the gas flows back to the test room after condensation


E. Installation of Drainage System of Salt Spray Test Chamber

1. Drilling requirements: the equipment is for natural drainage without pressure, and the height of the wall opening must be lower than the drainage port to ensure normal drainage

2. Interface requirements: The drain port of the equipment must be connected with a hose or a hard pipe and fixed with a sealing ring to prevent leakage.